Key Features
- Long throw offset servo is perfect for controlling ailerons on ultra micro models
- Offset provides for built-in differential
Overview
The 2.3-gram Linear Long Throw Offset Servo is a special use servo designed for modelers without computer transmitters who would like to add aileron differential to their ultra micro aircraft. It comes programmed with a 70/30 offset from center and can be used with any Spektrum AR6400-series receiver.
Detailed Information
Click Here to see Spektrum’s Servo Reference Chart
Compatible Products Spektrum 2.3-Gram Linear Long Throw Offset Servo SPMSA2030LO is compatible with EFLU1180, EFLU1280, EFLU1680, EFLU2600, EFLU2680, EFLU3250, EFLU3450, EFLU3650, EFLU3950, EFLU5380, HBZ4400, HBZ4480, HBZ5400, HBZ5480, HBZ5600, HBZ5650, PKZU2380
2.3 Gram Linear Long Throw Offset Servo Specfications:
- Bearing: Single
- Bushing Or Bearing: Bearing
- Connector Type: JST-SHR
- Gear Type: Plastic
- Servo Type: Analog
- Servo Voltage: 3.2–4.2V
- Speed: 0.10 sec end-to-end
- Torque: 3.5 oz (100 g)
Spec
- Brand: Spektrum
- Part No: SPMSA2030LO
- Barcode: 605482034651
- Fitment: Standard Part








Reviews
There are no reviews yet.